Summerwalk Parking Garage Restoration

A full interior renovation of a residential parking garage: leak repair, rust treatment and insulation overhead, new ceilings, rebuilt storage units, a regraded accessible ramp and fresh striping throughout.

Services

Masonry Restoration, Waterproofing

Location

Arlington, VA

Scope of Work

What We Did

The work ran in four phases, from documenting the existing layout through final striping.

01

Survey & Demolition

  • Note layout of all parking and storage units
  • Demo all existing storage units
  • Demo existing ceiling grid and tiles
02

Ceiling & Structure

  • Clean form deck ceiling to receive rust reversal treatment
  • Spray rust reversal treatment to all steel form deck, joists and beams
  • Install spray foam insulation to all ceilings
  • Install new ceiling tile grid and tiles
03

Leak Repair & Finishes

  • Perform grout injections to all walls of garage to stop active leaks
  • Prime and paint garage with two tone color scheme
  • Restripe parking lines and numbers
04

Storage & Accessibility

  • Rebuild new storage units
  • Paint storage units with two tone color scheme and number them accordingly
  • Demo existing handicap ramp, form and repour concrete to achieve a more gradual slope
  • Coat handicap ramp and landing

Project Gallery

The Finished Garage

Regraded accessible ramp and coated landing
Accessible ramp. Repoured to a more gradual slope, then coated along with the landing.
Two-tone walls, numbered storage units and new striping
Walls, storage and striping. Two-tone paint, rebuilt numbered storage units, new ceiling tiles and restriped spaces.

Planning a garage restoration?

Tell us about your building and our team will follow up with next steps.